The correct debugging of the high and low temperature cycle integrated machine is crucial to the good operation of the entire high and low temperature cycle integrated machine. For the refrigeration and heating system of the high and low temperature cycle integrated machine, preparations must be made before commissioning and close cooperation is required to avoid damage due to misoperation. High and low temperature cycle all-in-one machine. Because the high and low temperature cycle integrated machine is a medium-to-large refrigeration and temperature control equipment, the debugging process must be closely coordinated with the design, installation, and use. In order to ensure that the debugging work proceeds in an orderly manner, a temporary trial operation team needs to be formed by relevant personnel to direct the debugging work.

First of all, we must be fully familiar with the structure and performance of the high and low temperature cycle integrated machine, familiar with the safety technology of the refrigeration machine, clarify the debugging methods, steps and technical requirements that should be met, and formulate a detailed and specific debugging plan so that debugging personnel in each position can clearly understand their respective positions. tasks and requirements. Check whether the installation of the equipment meets the technical requirements, whether the equipment foundation meets the requirements, and whether the size, specifications and materials of the connecting pipes meet the design requirements. The power supply system of a high and low temperature cycle machine should be fully installed and debugged. The refrigeration system undergoes water cooling tests respectively, and the dirt in the waterway system is flushed. The water pump operates normally and the circulating water volume meets the operating conditions.
Clear the environment where the high and low temperature cycle integrated machine is debugged, make it clean, bright and unobstructed, prepare all kinds of general tools required for debugging, and prepare all kinds of pressure, temperature, flow, quality, time, etc. required for debugging. Measuring instruments and safety protection equipment required for debugging and operation are ready. After debugging is ready, professional debugging personnel will conduct debugging. Before debugging, carefully read the instruction manual provided by the manufacturer and read the instruction manual carefully.
The above is what Jinghua Instruments brings to you about the preparation work before debugging the high and low temperature cycle integrated machine . If you have any questions, you can contact us at any time and we will serve you wholeheartedly. Phone: 400-088-3616